china 9

CHINA 3  China 2

 china 9

In the heart of London Docks

Hartle worked very closely with CIMC to design and build the modules in china.

We had several engineers over in China to ensure standard and quality were maintained. 

Hartle installed all mechanical services including hot and cold water services, Air conditioning and ventilation systems. 

On this design a special requirement of a CHP system was installed to meet the carbon emissions imposed by London sustainability design policy.

 

 

 img_0317