New Assembly Plant Block 62
Landlord services to Plant Block 62 at the Solihull Jaguar Land Rover site
6
£5.5m
Project Details
Working with SDC Construction, Hartle provided landlord services to Plant Block 62 at the Solihull Jaguar Land Rover site.
This projected comprised of installing a high velocity heating system, which sends out conditioned air at a high velocity using less airflow than a regular system; gas; compressed air, which is kept under pressure that is greater than atmospheric pressure to power tools; cooling water; and ductwork, which distributes air flow from the air handling unit (AHU).
Location
Solihull Jaguar Land Rover
Main Contractor
SDC Construction
Services
- Compressed Air Systems
- Gas Installations
- High Velocity Air Systems
- Ventilation Systems
- Heating Systems
- Hot & Cold Water
Services Installed
Compressed Air Systems
Design and installation of reliable compressed air systems, from modifications to complete new turnkey installations.
Gas Installations
Complete commercial and industrial gas installations including mains distribution, metering and pressure management systems.
Heating Systems
Design and installation of efficient wet heating systems delivering reliable heat distribution across commercial environments.
High Velocity Air Systems
Specialist high velocity air systems providing efficient heating and ventilation for large industrial and storage spaces.
Hot & Cold Domestic Services Systems
Integrated hot and cold water storage and distribution systems incorporating renewable and district heating technologies.
Ventilation Systems
Energy-efficient ventilation systems delivering balanced air supply and extraction for optimal internal environmental control.
Related Projects
Blocks B2, C and D Student Accommodation
Full design and build turnkey package to this 261 bedroom student accommodation
Cobalt, Oxford – Phase 3 Fit Out Works
Phase 3 fit out works for an existing building consisting of new office space