JLR Gaydon B555 Phase 3
Hartle Ltd delivered a £1.1 million mechanical services package for the B555 Phase 3 development at Jaguar Land Rover's Gaydon test site.
5 Months
8
£1.1m
Project Description
Hartle Ltd has recently completed a £1.1 million mechanical services package for the B555 Phase 3 development at Jaguar Land Rover’s Gaydon test site, working alongside main contractor SDC Construction.
The project involved delivering mechanical services to the B555 Phase 3 roadway area, comprising office accommodation and a double-height roadway facility. The installation was designed to provide effective background ventilation alongside heating and cooling control throughout the development.
As part of the works, existing low-temperature hot water (LTHW) and chilled water services were extended to serve multiple bespoke air handling units, providing the heating, cooling and ventilation infrastructure required for the facility.
The wider mechanical services package included domestic hot and cold water, above-ground drainage, mechanical ventilation with heat recovery (MVHR), VRF air conditioning for the office areas, thermal insulation and a Building Energy Management System (BEMS).
Completed over a five-month programme, the project demonstrates Hartle’s ability to deliver coordinated mechanical services packages within specialist automotive facilities
Main Contractor
SDC Construction
Services
- Domestic Hot & Cold Water
- Above-Ground Drainage
- LTHW & Chilled Water Services
- Mechanical Ventilation with Heat Recovery (MVHR)
- VRF Air Conditioning
- Thermal Insulation
- Building Energy Management System (BEMS)
Services Installed
Hot & Cold Domestic Services Systems
Integrated hot and cold water storage and distribution systems incorporating renewable and district heating technologies.
Drainage
Above-ground drainage installations delivering efficient, compliant waste management solutions for commercial and industrial facilities.
Cooling Water
Design and installation of cooling water systems including chillers, towers and circulation networks.
Heating Systems
Design and installation of efficient wet heating systems delivering reliable heat distribution across commercial environments.
Ventilation Systems
Energy-efficient ventilation systems delivering balanced air supply and extraction for optimal internal environmental control.
Air Conditioning
Design, installation and commissioning of energy-efficient air conditioning systems delivering precise temperature control for commercial and specialist environments.
BMS & Controls
Comprehensive BMS and control solutions delivering intelligent monitoring, energy management and system optimisation across mechanical installations.
Related Projects
New Assembly of Plant Block 96
Jaguar Land Rover is a multinational UK automotive company, founded by the Ford Motor Company in 2002.
Evo Build Aston Martin
Aston Martin is a British manufacturer of luxury sports cars and grand tourers, founded in 1913 by Lionel Martin and Robert Bamford.
FA1 & FA2 Production Facility
New bespoke fuel management and delivery system to serve the FA1 and FA2 production facility at Jaguar Land Rover
New Assembly Plant Block 62
Landlord services to Plant Block 62 at the Solihull Jaguar Land Rover site
Red Bull Racing ERS Building
Red Bull Racing ERS Building is a new test facility situated on their technology campus in Milton Keynes.