9 Months
8
£2.5m
Project Details
Hartle Ltd provided a full mechanical design and build turnkey package delivered for a new 184 bedroom courtyard Marriott hotel based on POD bathrooms and traditional build FOH and BOH areas.
The scope and services provided for the project included domestic hot & cold water, above ground drainage, rainwater services, VRF air conditioning for bedrooms, mechanical heat recovery ventilation, LTHW heating, dry risers and building energy management system.
Location
London City Airport
Main Contractor
RG Group
Services
- Hot & Cold Domestic Services Systems
- Air Conditioning
- Drainage
- Ventilation Systems
- BMS & Controls
- Hot & Cold Water
- Low Temperature Hot Water System
- Above Ground Drainage
- Building Energy Monitoring System
Services Installed
Air Conditioning
Design, installation and commissioning of energy-efficient air conditioning systems delivering precise temperature control for commercial and specialist environments.
BMS & Controls
Comprehensive BMS and control solutions delivering intelligent monitoring, energy management and system optimisation across mechanical installations.
Compressed Air Systems
Design and installation of reliable compressed air systems, from modifications to complete new turnkey installations.
Cooling Water
Design and installation of cooling water systems including chillers, towers and circulation networks.
Public Health
Public health engineering services ensuring safe, compliant sanitation, air quality and drainage systems.
Ventilation Systems
Energy-efficient ventilation systems delivering balanced air supply and extraction for optimal internal environmental control.
Hot & Cold Domestic Services Systems
Integrated hot and cold water storage and distribution systems incorporating renewable and district heating technologies.
Drainage
Above-ground drainage installations delivering efficient, compliant waste management solutions for commercial and industrial facilities.
Related Projects
Blocks B2, C and D Student Accommodation
Full design and build turnkey package to this 261 bedroom student accommodation
Cobalt, Oxford – Phase 3 Fit Out Works
Phase 3 fit out works for an existing building consisting of new office space