Hollis Croft Student Accommodation
Hollis Croft is a new mixed use development situated in the centre of Sheffield. Comprising of 494 bedroom student accommodation spread across two blocks, one high rise up to 26 storeys and one low rise up to 10 storeys.
12 Months
8
£3.9m
Project Description
Hartle Ltd provided the full mechanical services package to this 494 bedroom student accommodation in Sheffield. Comprising of communal areas, studio and cluster bedrooms based on bathroom POD’s with service connections, services distribution and major plant.
Main Contractor
Aztec Construction
Services
- Domestic hot and cold water
- Above ground drainage
- Rainwater drainage
- ASHP domestic hot water generation
- Mechanical heat recovery ventilation (MVHR) systems
- VRF air conditioning for communal areas
- Thermal insulation
- Building energy management system (BEMS)
Services Installed
Hot & Cold Domestic Services Systems
Integrated hot and cold water storage and distribution systems incorporating renewable and district heating technologies.
Drainage
Above-ground drainage installations delivering efficient, compliant waste management solutions for commercial and industrial facilities.
Ventilation Systems
Energy-efficient ventilation systems delivering balanced air supply and extraction for optimal internal environmental control.
Air Conditioning
Design, installation and commissioning of energy-efficient air conditioning systems delivering precise temperature control for commercial and specialist environments.
BMS & Controls
Comprehensive BMS and control solutions delivering intelligent monitoring, energy management and system optimisation across mechanical installations.
Related Projects
Future-Proofing Apartment Developments Through Smart Mechanical Services
Today’s residents, developers and building owners are increasingly focused on long-term performance.
What Happens Before Mechanical Installation Begins on an Apartment Development?
A significant amount of planning and coordination takes place to ensure a successful apartment development.
Why Early Mechanical Design Decisions Save Time and Cost in Apartment Developments
The success of an apartment development depends on more than architectural design and construction quality.